Post Work Order Work In Progress


Back Office Menu -> Daily Close Menu -> Post Work Order Work In Progress

This posting utility is only visible in the menu tree with the Work Order In Progress Billing (WIP) processing is activated in the Custom Function Parameters, which allows multiple interim invoice billings on the same Work Order before the WIP Work Order is closed and a final billing is done.

G/L posting for WIP Work Orders and also for the WIP W.O. Invoices are different from the standard where one W.O. produces one W.O. Invoice.

The WIP G/L Posting Accounts for "Work In Progress"(WIP), "Unbilled Labor" (WIPL) and "Unbilled Services" (WIPS) are defined in the Work Order Work in Progress window in the Default Accounts by currency.

When a W.O. detail is entered, a 'Work In Progress' record is written that needs to be posted.
The W.O. transactions are posted using this Post Work In Work Progress utility usually before the Daily Close 1: Invoice Edit is run.
Posting transactions for the WIP Work Order are:

Debit - Work In Progress (WIP)
Credit - Parts Inventory from the Sales Product Class
Credit - Labor (WIPL)
Credit - Services (WIPS)

Postings for the WIP W.O. Invoices in the Daily Close 3 are also changed:

Parts: Credit - Revenue, Credit - WIP, Debit - COGS
Labor: Credit - Revenue, Credit WIP, Debit WIPL
Services: Credit Revenue, Credit - WIP, Debit - WIPS

Prompts to generate the posting report and post are:

DIVISION
This field displays ALL and is disabled if the Company Daily Close Parameter to “Post DBR By Division” is not activated so that the report will force ALL divisions.
If “Post DBR By Division” is enabled enter a Division or select one from the drop down list for this posting run.

Finished?
Click ACCEPT to print the posting report or CANCEL to abort.
Errors:
Any errors identified are displayed on the Review Work in Progress Cost/Account Errors.

POSTING Confirmation Screen
If no errors were reported, review the report output.

Click the YES button to begin posting the W.O. transactions to the General Ledger.
Click NO if the printer jammed or the report is not correct.

Posting Control:
The Post Work Order Work In Progress program is designed to be run by one operator at a time per batch.
Locking will occur if another operator attempts to run the program at the same time, or if the first operator did not exit the posting program correctly.
A Posting Control Information warning will appear on the screen preventing the second operator from proceeding, and only operators with Security Role permission to reset the Post Work Order Work In Progress flag will have access to the RESET button that unlocks the program.
Whenever the posting control flag for Post Work Order Work In Progress is reset, a record is written to the Delete Log for the Function WOIP10.


Topic Keyword: WOIP10
Converted from CHM to HTML with chm2web Pro 2.85 (unicode)